Whatsapp
Whatsapp
PD 4 (3)

Project – comprises two-storey apartment blocks, upon which sits the beautiful multi-levelled swimming pool, sauna, SPA and Fitness.

Light and airy, the interiors reflect your unique sense of style.

Choose from one bedroom apartments in ground floor with a spacious private garden or two bedroom duplex loft apartments on the penthouse floor with the roof terrace.

The natural-style swimming pool offers stunning sunset views under your feet.

Here you can take an early morning swim to start the day, or spend an afternoon sun-kissed by the pool after training in the gym.

02

Apartment details:

2 bedroom apartment penthouse loft (2 bathrooms)

Total area – 109,56m2, balcony – 15,84m2, roof terrace – 31m2.

Price – 161 500£

Apartment with roof terrace with great views. Ventilation in all bathrooms, fully equipped bathrooms & kitchen with stone countertops.  Built-in wardrobes in each bedroom (with mirror), double glazed windows. Internal doors, ceramic floor and laminate in bedrooms. Parking space. Possibility to order a design package.

03

The complex offers types of properties:

  • ground floor one bedroom apartment with spacious private garden
  • duplex loft apartment with two bedrooms in a penthouse with a roof terrace

 

PD 4 (1)
PD 4 (1)
PD 4 (2)
PD 4 (2)
PD 4 (3)
PD 4 (3)
PD 4 (4)
PD 4 (4)
previous arrowprevious arrow
next arrownext arrow
PD 4 (1)
PD 4 (1)
PD 4 (2)
PD 4 (2)
PD 4 (3)
PD 4 (3)
PD 4 (4)
PD 4 (4)
previous arrow
next arrow
04

Infrastructure of the complex:

  • Multi-level outdoor pools
  • SPA
  • Sauna
  • Fitness/Gym & Pilates
  • Pool bar
  • Open air cinema
  • Outdoor yoga area

 

05

Project location:

  • 18 km from the city of Kyrenia
  • Within walking distance of the promenade,
  • Restaurant
  • Supermarket
  • Cafe/pastry shop
  • Esentepe city within walking distance from the complex
  • complex opposite the sandy beach of Esentepe

 

06

Payment plan:

2000£ – Deposit

35% – down payment

65% – Until Key handover

5% – VAT tax together with key delivery

07

Delivery blocks:

Start of construction: ~02.2023

End of construction: 08.2024